TIRUMALA TIRUPATI DEVASTHANAMS, TIRUPATI

CHITTOOR (DIST) ANDHRAPRADESH

SUPERINTENDING ENGINEER-II

 

 

 

 

 

 

Adv. No. 08/TA/ SE-II/ TTD/ TPT/ 2010-11                                                     Date: 21 .07 .2010

 

 

 ‘e’-PROCUREMENT  TENDER NOTICE

 

 

Sl.

No.

NIT. No.

Name of work

Estimate Amount  Rs. In lakhs & Time for completion

Schedule down load start date

Down load end date & last date for bid submission

 

I

 

SUPERINTENDING ENGINEER-II Circle

 

1

59/SE-II/TTD /2010-11

Improvements to the SMC Cottages (Group-II) from 222 to 225, 227 to and 238 to 244 at Tirumala.

 

62.00

3 Months

13.08.2010

5:00 PM

 

28.08..2010

1:00 PM

&

28.08.2010

3:00 PM

2

60/SE-II/TTD /2010-11

Improvements to the SMC Cottages (Group-III) from 245 to 260, 262 to 265 and 273 to 276 at Tirumala.

70.00

3 Months

 

13.08.2010

5:00 PM

 

28.08..2010

1:00 PM

&

28.08.2010

3:00 PM

3

61/SE-II/TTD/2010-11

Improvements to the Cottages in HVC Area Group-II  (Block no. 637, 639, 641, 642, 643, 645, 647, 681, 683, 685 & 687 with 88 Rooms) at Tirumala.

81.00

3 Months

13.08.2010

5:00 PM

 

28.08..2010

1:00 PM

&

28.08.2010

3:00 PM

4

62/ SE-II/TTD/2010-11

Improvements to the Cottages in HVC Area Group-IV (Block no. 674, 676, 678, 680, 682, 684, 690, 691, 692, 693 & 694 with 88 Rooms) at Tirumala

 

81.00

3 Months

17.08.2010

5:00 PM

 

01.09..2010

1:00 PM

&

01.09.2010

3:00 PM

5

63/ SE-II/TTD/2010-11

Improvements to the HVDC area Cottages No. 491, 492, 493, 494 & 496 at Tirumala.

48.00

3 Months

17.08.2010

5:00 PM

 

01.09..2010

1:00 PM

&

01.09.2010

3:00 PM

6

64/ SE-II/TTD/2010-11

Improvements to the cottages in HVC Area Group-III (Block No. 644, 646, 648, 671, 673, 675, 677, 679, 686, 688 & 689 with 88 Rooms) at Tirumala

 

81.00

3 Months

17.08.2010

5:00 PM

 

01.09..2010

1:00 PM

&

01.09.2010

3:00 PM

7

65/SE-II/TTD/2010-11

Construction of New Kitchen Block at VQC-II  at  Tirumala.

270.00

9 Months

05.08.2010

5:00 PM

 

21.08..2010

1:00 PM

&

21.08.2010

3:00 PM

8

66/SE-II/TTD/2010-11

Providing cordon Security around  Sri  T.T.,&  Mada streets at Tirumala.

295.00

9 Months

10.08.2010

5:00 PM

 

26.08..2010

1:00 PM

&

26.08.2010

3:00 PM

9

67/SE-II/TTD /2010-11

Construction of RCC Roof  Shelters in  place of damaged Iron shelter from Step No. 2910 to 3332 in Alipiri footpath  Tirumala.

 

94.00

9 Months

 

05.08.2010

5:00 PM

 

21.08..2010

1:00 PM

&

21.08.2010

3:00 PM

10

 

68/SE-II/TTD /2010-11

Widening of existing single lane road to two lane road from Vedagiri Junction to Srivari Padalu at Tirumala

210.00

9 Months

 

10.08.2010

5:00 PM

 

26.08..2010

1:00 PM

&

26.08.2010

3:00 PM

11

69/SE-II/TTD /2010-11

Widening of footpath and providing shelter from Sri Lakshmi Narasimha Swamy temple to Mokalimitta (Left over portions) in 1st Ghat road, Tirumala

235.00

9 Months

 

 

05.08.2010

5:00 PM

 

21.08..2010

1:00 PM

&

21.08.2010

3:00 PM

12

70/SE-II/TTD /2010-11

Construction of RCC Kerb walls from 12/0 to 16/7 KM  in 2nd  Ghat road, Tirumala

15.00

2 Months

 

 

10.08.2010

5:00 PM

 

26.08..2010

1:00 PM

&

26.08.2010

3:00 PM

13

71/SE-II/TTD /2010-11

Construction of Mini Kalyanakatta adjacent to SPGH Sub-Enquiry and Improvements to SPGH Sub-Enquiry Office in SP Nagar area  Tirumala

 

17.00

2 Months

 

 

11.08.2010

5:00 PM

 

27.08..2010

1:00 PM

&

27.08.2010

3:00 PM

II

EXECUTIVE ENGINEER-V Division (SHORT TENDER)

1

4/EE-V/TTD/2010-11

Erection and removal of decorative ply-wood arches at various places, Tirumala  in connection with Srivari Salakatla & Navarathri Brahmotsavams for the year 2010

1.85

05.08.2010

5:00 PM

 

13.08..2010

1:00 PM

&

13.08.2010

3:00 PM


 

III

 

EXECUTIVE ENGINEER-WW  Division (SHORT TENDERS)

 

1

82 / EEWW / 2010-11

Annual maintenance Contract and Materials required for gas leakage alarm system for Srivari potu LPG plant and Annadanam Canteen at Tirumala for the year 2010-11

1.50

12 Months

26-07-2010

5:00 PM

 

03.08..2010

1:00 PM

&

03.08.2010

3:00 PM

2

83 / EEWW / 2010-11

Annual maintenance of Weighing machines and Load cells Sri TT, SVNACC and marketing Godown at Tirumala for the year 2010-11

1.50

12 Months

26-07-2010

5:00 PM

 

03.08..2010

1:00 PM

&

03.08.2010

3:00 PM

3

84 / EEWW / 2010-11

Annual maintenance and supply of Spares for Currency counting machines in Srivari parakamani in Sri TT at Tirumala for the year 2010-11

0.70

12 Months

26-07-2010

5:00 PM

 

03.08..2010

1:00 PM

&

03.08.2010

3:00 PM

4

85 / EEWW / 2010-11

Supply of SS Supports (Channels) to trolley brackets in SVNACC & PAC-II at Tirumala

0.80

15 days

26-07-2010

5:00 PM

 

03.08..2010

1:00 PM

&

03.08.2010

3:00 PM

5

86 / EEWW / 2010-11

Providing Cold water connections to Solar Hot water Systems at Kousthubham Guest house at  Tirumala

1.45

15 days

26-07-2010

5:00 PM

 

03.08..2010

1:00 PM

&

03.08.2010

3:00 PM

6

87 / EEWW / 2010-11

Supply of Stand-by Motor to the Machines in temple section of Dy.EE, Mechanical Sub-division, Tirumala                   

4.00

1 Month

26-07-2010

5:00 PM

 

03.08..2010

1:00 PM

&

03.08.2010

3:00 PM

7

88 / EEWW / 2010-11

Supply of Trolleys, Castro wheels to SVNAC and PAC –II at Tirumala                                 

4.90

1 Month

26-07-2010

5:00 PM

 

03.08..2010

1:00 PM

&

03.08.2010

3:00 PM

8

89 / EEWW / 2010-11

Supply, Installation and Commissioning of Stand-by Jockey pump to the fire fighting system at BSM plant for Sri T.T. Tirumala  

                

1.30

1 Month

26-07-2010

5:00 PM

 

03.08..2010

1:00 PM

&

03.08.2010

3:00 PM

9

90 / EEWW / 2010-11

Laying of 100 mm dia DI pipe line to New Annadanam Sump & Kalyanamasthu building at VSGH Sump to New Annadanam complex at Tirumala

 

 

 

10.00

2 Months

26-07-2010

5:00 PM

 

03.08..2010

1:00 PM

&

03.08.2010

3:00 PM

10

91 / EEWW / 2010-11

Providing Drinking water facilities alround outer ends of galleries in FOUR Mada Streets and front side of open yard of Srivari temple, Tirumala

9.00

1 Month

26-07-2010

5:00 PM

 

03.08..2010

1:00 PM

&

03.08.2010

3:00 PM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I      V

EXECUTIVE ENGINEER-FMS Division

1

08/EEFMS/2010-11

Construction of Sentry post and Security Check point at S.P.Guest hosue, tirumala

2.10

1 Month

03.08.2010

5:00 PM

 

18.08..2010

1:00 PM

&

18.08.2010

3:00 PM

           

 

 

Note:- For full details log on to the website https://tender.eprocurement.gov.in/    or  http://www.eprocurement.gov.in/

                    

 

      In the service of Lord Venkateswara

                                                                                                 Sd/-M.Ramesh Reddy

                         Superintending Engineer-II